Building the hull & deck: Part 3
The 6.5 tonne lead ballast arrives after being cast locally. This lead ballast which is housed in the bulb of the ZERO Keel offers the yacht an optimal centre of gravity without compromising our ethos of a fully integral keel.
The structure is welded and fibre glassed onto the hull mould to provide a strong base for it to sit when removed from the male plug.
With the structure complete and the mould painted, it is ready to be removed from the plug one half at a time.
This huge operation was completed with three cranes and required delicate planning and precision during the process.
The mould half is carefully turned over and once in position, industrial strength wheels are added for ease of manoeuvring.
Both halves are wheeled into position and checked for imperfections. Both halves are ready to be connected and will be prepared with a release wax prior to commencement of lamination.